PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Ground rod Facing South (800x600).jpg Installing wall forms along column line 6.5 (G-D) Facing East (800x600).jpg Welding Derrick -2 3rd Floor Facing West  (800x600).jpg Finished installing the wall forms along column line 6.5 (G-D) Facing South-West (800x600).jpg Installing Steel angles at Elev. 1,2,3 for the 3rd Floor Metal decking Facing North-West  (800x600).jpg Underfround roughing at Room 173 Facing East (800x600).jpg Underground roghing at Room 173 Facing South-Easat (800x600).jpg Underground roughing at Room 173 Facing North (800x600).jpg
Previous pageNext page Installing Steel angles at Elev. 1,2,3 for the 3rd Floor Metal decking Facing North-West  (800x600)
Installing Steel angles at Elev. 1,2,3 for the 3rd Floor Metal decking Facing North-West (800x600)